dc.contributor Ph.D. Program in Industrial Engineering.
dc.contributor.advisor Ünal, Ali Tamer.
dc.contributor.author Güngör, Murat.
dc.date.accessioned 2023-03-16T10:35:23Z
dc.date.available 2023-03-16T10:35:23Z
dc.date.issued 2018.
dc.identifier.other IE 2018 G86 PhD
dc.identifier.uri http://digitalarchive.boun.edu.tr/handle/123456789/13568
dc.description.abstract Lot-sizing is concerned with the product quantities, whereas scheduling considers the specific machines and product sequences. Lot-sizing and scheduling refers to pro cedures that aim to solve these interdependent problems simultaneously. In this thesis, we investigate three lot-sizing and scheduling problems encountered in flow shops. The first one is a single-level parallel machine problem with a secondary resource and cumu lative demand, where the objective is to minimize the number of setups and teardowns. The second examines a two-machine flow shop with a serial bill-of-materials. The goal is to first minimize back orders and then the number of changeovers. The third prob lem arises in the two-machine flow shop as well. The question is whether there exists a feasible production plan to satisfy all requirements. For the first two problems, we sug gest reformulations, prove several optimality conditions, and carry out computational experiments. For the last one, we develop a polynomial algorithm after giving some theoretical results.
dc.format.extent 30 cm.
dc.publisher Thesis (Ph.D.)-Bogazici University. Institute for Graduate Studies in Science and Engineering, 2018.
dc.subject.lcsh Production scheduling.
dc.subject.lcsh Production control.
dc.subject.lcsh Production management .
dc.title Lot - sizing and scheduling in flow shops
dc.format.pages xiv, 73 leaves ;